ADVANTAGE CONSULTING GROUP LTD.

subglobal1 link | subglobal1 link | subglobal1 link | subglobal1 link | subglobal1 link | subglobal1 link | subglobal1 link
subglobal2 link | subglobal2 link | subglobal2 link | subglobal2 link | subglobal2 link | subglobal2 link | subglobal2 link
subglobal3 link | subglobal3 link | subglobal3 link | subglobal3 link | subglobal3 link | subglobal3 link | subglobal3 link
subglobal4 link | subglobal4 link | subglobal4 link | subglobal4 link | subglobal4 link | subglobal4 link | subglobal4 link
subglobal5 link | subglobal5 link | subglobal5 link | subglobal5 link | subglobal5 link | subglobal5 link | subglobal5 link
subglobal6 link | subglobal6 link | subglobal6 link | subglobal6 link | subglobal6 link | subglobal6 link | subglobal6 link
subglobal7 link | subglobal7 link | subglobal7 link | subglobal7 link | subglobal7 link | subglobal7 link | subglobal7 link
subglobal8 link | subglobal8 link | subglobal8 link | subglobal8 link | subglobal8 link | subglobal8 link | subglobal8 link

Services / Products / Documents / News /Home

ADVANTAGE CONSULTING GROUP LTD

TIME STUDIES (TIME AND MOTION)

 

 

 

 

TIME STUDIES ARE AN INTEGRAL PART OF ANY PRODUCTIVITY SURVEY.

 

FIND OUT HOW PRODUCTIVE YOUR OPERATION CURRENTLY IS AND HOW YOU CAN IMPROVE OVERALL PRODUCTION.

 

 

 

Advantage Consulting Group can use time studies as part of any type of survey we perform.

These include:

  1. Engineered performance standards
  2. Method Studies
  3. Manpower assessments
  4. Flow /Through Put studies

 

Advantage Consulting's time studies are unique in that they measure all areas of an operation.

    A Warehouse Picking Time ( Time and Motion) Study might include:

    1. Travel
    2. Mounting and Dismounting Equipment
    3. Picking Product
    4. Getting and Attaching Labels
    5. Wrapping the pallet
    6. Entering product in the voice or RF system

    A Manufacturing Time (Time and Motion) study might include:

    1. Travel
    2. Getting Part
    3. Securing Part
    4. Machining Part
    5. Positioning Part
    6. Entering Data
    7. Sending Part to Next Station

    A Packing Time (Time and Motion) study might include:

    1. Getting Case
    2. Assembling Case
    3. Packing Case
    4. Closing Case
    5. Staging Case
    6. Attaching Label
    7. Traveling to Line
    8. Stacking on Pallet

     

    Call us at (630) 964-0625 to find out what elements we would study in your operation.

    ADVANTAGE CONSULTING GROUP will work with management to create a project plan that takes into account all of the areas considered vital to the productivity of the operation.

    After completion of the time study, Advantage Consulting Group can develop software to calculate each specific assignment so that the most accurate time standard is assigned to each assignment. Advantage can either work with the customers IT department to calculate the standards in the current mainframe system, or develop a stand alone software package for the customer.

    Call Advantage Consulting Group at (630) 964-0625 or e-mail us at inquires@advantageconsultinggrp.com for more information.

     

 

 

About Us || Privacy Policy | Contact Us | ©2010 Wilson's Advantage Consulting Group LTD.